Environmental Information Disclosure Form for Key Pollutant-Discharging Units in Suzhou City
15 Oct,2020
|
I. Basis Foundation Letter Breath: |
||||||||||||||
|
Unit Name |
Zhangjiagang CIMC Sanctum Cryogenic Equipment Co., Ltd. |
|||||||||||||
|
Organizational Structure on behalf of code |
913205827185400732 |
law Set Representative |
Xu Zhiquan |
United system square formula |
58935178 |
|||||||||
|
Production Address |
South Port West Middle Road, Jingang Town, Zhangjiagang City |
|||||||||||||
|
Main Contents of Production, Operation, and Management Services |
Low-Temperature Pressure Vessel Manufacturing |
|||||||||||||
|
Products and Scale |
1,000 cryogenic tank trucks, 2,000 cryogenic tank containers, and 500 shell fabrications |
|||||||||||||
|
II. Ranking dirty Letter Breath: |
||||||||||||||
|
Class Don't |
Wastewater (Unit: mg/l ) |
waste Qi (Unit: mg/m3 ) |
||||||||||||
|
Pollutant |
CODcr |
Ammonia Nitrogen |
Total phosphorus |
Suspended matter |
BOD |
Particulate matter |
Non-methane total hydrocarbons |
|||||||
|
Emission concentration |
195 |
1.1 |
1.76 |
30 |
69 |
20.55 |
8.5 |
|||||||
|
Implementation Standard |
Water Quality Standards for Wastewater Discharged into Urban Sewer Systems GB/T 31962-2015 |
Integrated Emission Standards for Air Pollutants GB16297-1996 |
||||||||||||
|
Exceedance situation |
None |
None |
||||||||||||
|
Emission method |
Connecting to the wastewater treatment plant |
Xenophobic environment |
||||||||||||
|
Total emissions (tons / year) |
6.59 |
0.4 |
0.05 |
1.013 |
2.33 |
3.9 |
5.83 |
|
||||||
|
Approved Total emissions (tons / year) |
None |
None |
|
|||||||||||
|
Arrange Put mouth
Quantity and
Distribution status |
Discharge outlet 1 |
Longitude: 120 degrees 24 minutes 33.77 seconds Latitude: 31 degrees 54 minutes 22.68 seconds |
Exhaust stack 1 |
Longitude: 120 degrees 24 minutes 44.82 seconds Latitude: 31 degrees 54 minutes 35.17 seconds |
||||||||||
|
Exhaust stack 2 |
Longitude: 120 degrees 24 minutes 38.45 seconds Latitude: 31 degrees 54 minutes 31.14 seconds |
|||||||||||||
|
Exhaust Stack 3 |
Longitude: 120 degrees 24 minutes 38.23 seconds Latitude: 31 degrees 54 minutes 22.28 seconds |
|||||||||||||
|
Exhaust Stack 4 |
Longitude: 120 degrees 24 minutes 38.41 seconds Latitude: 31 degrees 54 minutes 30.38 seconds |
|||||||||||||
|
Exhaust Stack 5 |
Longitude: 120 degrees 24 minutes 38.09 seconds Latitude: 31 degrees 54 minutes 28.22 seconds |
|||||||||||||
|
Exhaust stack 6 |
Longitude: 120 degrees 24 minutes 38.45 seconds Latitude: 31 degrees 54 minutes 24.59 seconds |
|||||||||||||
|
Exhaust stack 7 |
Longitude: 120 degrees 24 minutes 41.18 seconds Latitude: 31 degrees 54 minutes 27.18 seconds |
|||||||||||||
|
III. Construction and Operation of Pollution Prevention and Control Facilities: |
||||||||||||||
|
Wastewater Treatment Set Implement |
Yes No Build Set |
Yes |
||||||||||||
|
Main Processing Procedures |
Acid pickling wastewater: equalization tank + Fenton oxidation + anaerobic treatment + aerobic treatment + sedimentation + reverse osmosis + MVR. Paint wastewater: collection tank + dissolved air flotation + anaerobic treatment + aerobic treatment + sedimentation tank. |
|||||||||||||
|
Is it operating normally? |
Yes |
|||||||||||||
|
Waste gas treatment Set Implement |
Yes No Build Set |
Yes |
||||||||||||
|
Main Processing Procedures |
Two sets of organic waste gas treatment facilities: water curtain + filter cotton + activated carbon adsorption + desorption catalytic combustion. An organic waste gas treatment system: filter cotton + activated carbon adsorption + desorption catalytic combustion Four sets of dust and exhaust gas treatment facilities: cartridge-type dust collectors |
|||||||||||||
|
Is it operating normally? |
Yes |
|||||||||||||
|
IV. Environmental Impact Assessment of Construction Projects and Other Administrative Permits for Environmental Protection: |
||||||||||||||
|
Has the construction project undergone environmental impact assessment approval? |
Yes |
|||||||||||||
|
Has the construction project undergone environmental protection acceptance inspection? |
Yes |
|||||||||||||
|
Other Administrative Licensing Matters Related to Environmental Protection |
None |
|||||||||||||
|
V. Emergency Response Plan for Sudden Environmental Incidents: (Upload as an attachment) |
||||||||||||||
|
VI. Other Environmental Information That Should Be Made Public and Explanations of Relevant Matters: |
||||||||||||||
|
Note: Key national monitored enterprises shall also publicly disclose their self-monitoring plans (to be uploaded as an attachment).
|
||||||||||||||
Instructions for Completion:
1. Fill in “Whether the situation” : “ Yes “or” “no” ;
2. Emission method refers to: Exclusionary environmental conditions, connection to a wastewater treatment plant, zero discharge, and outsourced transportation, among others;
3. The total emissions are: Total emissions for the previous year;
4. All key pollutant-discharging units Generate a public network based on the table content. IP (Can be INTERNET Online
Provide the page address (that is accessible) to the local environmental protection bureau. Environmental Protection Bureaus across the country Responsible for centrally linking the forms to each environmental protection bureau.
Disclose environmental information on the website;
5. Key pollutant-discharging entities whose environmental information shall be made public by all localities include national key monitoring enterprises within their respective administrative jurisdictions. , Key national monitored enterprises shall also publicly disclose their self-monitoring plans.
More Information