A Brief Discussion on Control Measures for Storage Tank Installation Projects by Suzhou LNG Storage Tank Manufacturers
21 Jan,2021
A Brief Discussion on Control Measures for Storage Tank Installation Projects by Suzhou LNG Storage Tank Manufacturers
For LNG storage tanks, Suzhou LNG storage tank manufacturer —According to CIMC Sanctum, quality control for tank installation and construction is divided into three phases: prefabrication of tank components, pre-assembly of tank components, and formal tank installation, with quality control required throughout the entire construction process. In particular, professional control measures throughout the entire installation project are essential and constitute a critical component. Next, the Suzhou LNG tank manufacturer will outline the specific control measures.

Professional Control Skills and Measures
⑴ After the cutting of prefabricated components such as the base slab, arch crown slab, pressure ring, and wall lining panels is completed, identification labels shall be transferred to these components.
⑵ For the external pre-assembly construction of the dome and the pressure-bearing ring, the Suzhou LNG storage tank manufacturer notes that environmental factors should also be taken into account, and specific measures for winter and rainy seasons should be formulated.
⑶ When assembling the bottom plate edge panels, thermal corner protection wall panels, inner tank wall panels, and other components, counter-deformation measures shall be implemented.
⑷ During the construction of the inner tank wall panels, implement a rational tooling and fixture plan to ensure dimensional accuracy and safety requirements.
⑸ The installation of the bottom and wall panels shall be meticulously inspected in strict accordance with the LNG storage tank inspection and testing plan (ITP document).
⑹9% Ni steel shall be properly stored and protected to prevent magnetization and must not be subjected to hammering. When temporary tooling is removed, cutting must be used to avoid damaging the base material.
⑺ After welding, the welds shall be visually inspected; prior to inspection, slag, spatter, and other contaminants must be thoroughly removed. According to the Suzhou LNG storage tank manufacturer, the weld surface and heat-affected zone shall be free from defects such as cracks, porosity, slag inclusions, and arc craters. Inspection marks shall be clearly applied at the weld locations, detailed records shall be maintained, and inspection shall be reported accordingly.
⑻ The inner and outer surfaces of the vertical and circumferential seams of the inner tank shell plates shall be ground smooth.
⑼ 100% RT inspection shall be performed on the butt joints of the inner tank edge plates, the welds of the shell plates, and the butt joints of the stiffening rings, among others.
⑽ All weld scars on the steel plates must be ground smooth, subjected to PT inspection, and clearly marked on the layout drawing.
⑾ The heat batch number for all steel plates shall be specifically recorded on the layout drawing.
⑿ During the water-filling test, it must be verified that there are no leaks in the inner wall panel welds and that the annular concrete ring beam is free of cracks except at the construction joints.
⒀ The contents of tank settlement monitoring include settlement monitoring of the tank’s outer wall, as well as measurements of differential inclination and settlement between the outer wall panels. The elevation difference in settlement between the inner and outer tanks is determined using temporarily installed monitoring points.
⒁ The storage tank shall be subjected to positive and negative pressure tests.
Zhangjiagang CIMC St. Davin Cryogenic Equipment Co., Ltd. is a manufacturer of cryogenic storage tanks, LNG storage tanks, LNG fueling station equipment, cryogenic liquid transport vehicles, natural gas storage tanks, LNG tank trucks, liquid nitrogen storage tanks, carbon dioxide storage tanks, and cryogenic liquid nitrogen transport vehicles. Our cryogenic liquid storage tanks, tank trucks, tank containers, and cryogenic insulated cylinders are widely recognized by numerous renowned gas companies at home and abroad for their advanced technology, outstanding quality, and exceptional after-sales service. We welcome you to contact us for more information.